Sprint Backlog Progress Report
Update on the progress on User Stories @ 22.10.2015
US 1 - completed MB: issue #845 to be verified.
- Link: #66
US 2 - completed
- Link: #67
US 3 - completed
- Link: #68
US 4 - completed
- Link: #69
US 5 - completed
- Link: #244
US 6 - completed
- Link: #245
US 7 - completed (is verified after refoctoring, need to be demonstrated)
- Link: #246
US 8 - in progress (in regression)
- Link: #247
- Filter is not tested. Work around will be use as long no well tested funktion is provided.
- Issue 854 needs to be fixed
- Tested @27.10.2015: US 8 inkl. Transition NTC to Level 2 works correct. NTC Speed needs to be changed from 140 to 40.
- can be changed to regression @02.11.2015.
US 9 - in progress (to be tested)
- Link: #248
- Movement Authority request to be positioned in the right coordinated system. Testing of Movement Authority correction will be tested by @JakobGärtner. Work in progress for implementing and test on the 22nd of october. BJ: DMI planning area to be tested today. PF: DMI interacing ready for test; BJ: Speed supervision ready for test.
- Tested @27.10.2015: US 9 works correct. Behaviour of the MA handover (timing) needs be be checked.
- Gradient profiles has been fixed and needs be tested.
@02.11.2015
- @02.11.15 Status in maintenance: Gradient Profile, Flags on DMI and Planning needs to be fixed (Jakob Gärtner)#886
- @02.11.15 Indication Marker for TSR Modus needs to be implemented (Shuangjiao Cao)#868
- @02.11.15 TSR must be integrated into the EVC Model (Jakob Gärtner and Bernd Hekele)#868
- @02.11.15 Message 15 error needs to be corrected (Johannes Kastner)
- @02.11.15 Incorrect behaviour of gradient profile @20000 (Jakob Gärtner) #886
- @02.11.15 Irregular behviour of Speed Supervision (Thorsten Schulz) #885
US 10 - open
- Link: #249
- Level Change change from Level 2 to NTC should work and needs to be tested.(Marielle Petit Doche)
- Train will be supervised in ATB mode in the same pattern as in the beginning in Amsterdam. Can be tested (Jakob Gärtner)
@02.11.2015
- Ack is mission on the level change procedure Level 2 to NTC (Bernd Hekele)
- Emergency brake immadiately after Level transition (Bernd Hekele)#874
US 11 - open
- 
Link: #250 
- 
Level Change from Level 2 to NTC is implemented and needs to be tested. (Bernd Hekele) 
- 
Reaction of RBC on pos. report with level NTC to terminate communication session must be implemented (Rainer Lampatzer) 
US 12 - open
- Link: #251
- RBC message to teminate radio session is implemented (Johannes Kastner)
- Termination of Communication is implemented in MoRC (Uwe Steinke)
- Termination of Radio Connection tested.
@02.11.2015
- Implement Standby supervision in DMI Controller (Baseliyos Jacob)
- Test of Mode Change to SB in Mode and Level Management (Bernd Hekele)
US 13 - open
- 
Link: #70 
- 
Track Model to simulate the scenario has been started (Jakob Gärtner). 
- 
How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) 
- 
RBC Model to simulate the scenario needs to be started. (Johannes Kastner) 
- 
Braking Curve Model needs to be tested according to the US (Thorsten Schulz) 
@02.11.2015:
- Track Model for US 13 will be delivered by LEA (Jakob Gärtner)
- RBC Model needs to be tested (Rainer Lampatzer)
- Braking Curve Model needs to be tested (Thorsten Schulz)
US 14 - open
- 
Link: #71 
- 
Track Model to simulate the scenario has been started (Jakob Gärtner). 
- 
How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) 
- 
DLR will deliver implementation of the User Story (Marc Behrens) 
- 
RBC Model to simulate the scenario needs to be started. (Rainer Lampatzer) 
- 
Mode and Level Management needs to be tested (Bernd Hekele) 
- 
DMI Controller and Management needs to be tested (Baseliyos Jacob) 
- 
Environment model to brake release needs to be tested (Stefan Karg) 
- 
Braking Curve Model needs to be tested according to the US (Thorsten Schulz) 
- 
MB: test model work in progress with RT-tester (@Mairamou to be contacted) 
@02.11.2015:
- Track Model is in process (Jakob Gärtner)
- RBC Model needs to be tested (Rainer Lampatzer)
- Mode and Level Management needs to be tested (Bernd Hekele)
- Braking Curve Model needs to be tested (Thorsten Schulz)
US 15 - open
- Link: #72
- Track Model to simulate the scenario has been started (Jakob Gärtner).
- How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner)
- RBC Model to simulate the scenario needs to be tested. (Johannes Kastner)
- Mode and Level Management needs to be tested (Marielle Petit Doche)
- DMI Controller and Management needs to be tested (Baseliyos Jacob)
- Environment model to brake release needs to be tested (Stefan Karg)
- Braking Curve Model needs to be tested according to the US (Thorsten Schulz)
US 16 - open
- 
Link: #73 
- 
Track Model to simulate the scenario has been started (Jakob Gärtner). 
- 
How to bring the Onboard Unit in the right status needs to be clarified (Jakob Gärtner) 
- 
RBC Model to simulate the scenario needs to be tested. (Johannes Kastner) 
- 
Mode and Level Management needs to be tested (Marielle Petit Doche) 
- 
DMI Controller and Management needs to be tested (Baseliyos Jacob) 
- 
Environment model to brake release needs to be tested (Stefan Karg) 
- 
Braking Curve Model needs to be tested according to the US (Thorsten Schulz)